Independent Scaffolds
Load Class 1
(Very Light Duty 0.75kN/m2) used for inspection, access and light cleaning.

Load Class 2
(Light Duty 1.5kN/m2) used for plastering, painting, stone cleaning, glazing and pointing

Load Class 3
(General Purpose 2.0kN/m2) used for general building work including brickwork, window and mullion fixing rendering and plastering.

Load Class 4
(Heavy-Duty 3.0kN/m2) used for heavy masonry work, concrete block work and heavy cladding.


Loading Bay
Specifically design structures to accommodate the loading and unloading of materials and equipment, allowing for the temporary storage and distribution across construction sites.
Birdcages
Small and large access platforms allowing access to hard-to-reach areas like ceiling and roofs.
Scaffolding Towers
Temporary, often free-standing to allow access to small areas that often require painting, maintenance or repairs.
System Staircases
Lightweight, aluminum staircases allowing safe access to and from different levels of the scaffolding.
Cantilevered Scaffolding
Specially designed scaffolds to allow access to areas where scaffold cannot be build on the below structures (Weak roofs/Poor ground conditions)
Gantry Scaffolding
Temporary platforms to allow access to and from construction sites
Haki Staircases
Modular temporary staircases offering continuous safe access across multiple levels of a building.
Cuplok Staircases
Cost effective aluminum staircases, helping improve site safety by reducing the need for site operatives to climb ladders.
Rubbish Chutes
Plastic chutes to allows for a controlled method of removing waste from different elevations while reducing manual handling costs/risks.
Hoist Hire
Material & Pedestrian hoist available
Temporary Fencing solutions
Site perimeter fencing and boarding solutions
Handrail & Edge Protection
BS EN 13374 compliant fixed and free-standing h-rail solutions
Shoring Scaffolding
Scaffolding framework to support heavy during construction, such as concrete floor and ceiling supports
Scaffold Propping
Temporary propping of structure components such as beams, walls or slabs until cured.
Temporary Roofs
Protective structures to protect projects from weather elements allowing construction, renovation and maintenance work to continue uninterrupted.
Scaffold Inspections
7 day inspection in-line with HSE’s requirements are available.
Risk Assessments
Carried out for each project ensuring the health and safety of operatives and the public is prioritised.
Work Methodologies
Specific working methods are followed on each project to ensure compliance
Tree Protection
BS5837 approved tree protection
Pedestrian Protection Fans
Cantilevered protection fans are used in combination with other safety measures to protect the public from falling tools or materials.
Pavement Lifts
A base lift in the scaffold to allow members of the public to walk under the first lift of scaffold, typically used on public pavements.